Project Background
The project sits in a hotel resort in the Philippines, with a planned capacity of around 1.1 MW. A continuous PV walkway links the hotel buildings, parking areas and main pedestrian routes, so the modules serve three purposes: power generation, shading and a more comfortable walking experience around the resort.
Our company supplied the H-section steel columns, main beams and related main structural members, providing the structural basis for the continuous PV canopy.

Figure 2. H-section main structure for the hotel PV walkway
Project Challenges
The hotel walkway runs through a public area used frequently by guests. Compared with an ordinary industrial project, higher standards apply to the appearance of the structure, clear passage height and the neatness of the members.
The continuous canopy consists of repeated units. If the column spacing, main beam length or connection positions are not consistent, the walkway will show crooked lines, misaligned columns or an uneven arrangement of the modules above, directly affecting the overall impression of the resort.
Rainfall in the Philippines is frequent, so the walkway must also handle rainwater drainage. The structural members and modules above must not interfere with existing roads, entrances or drainage areas, otherwise water could collect under the canopy or block pedestrian passage.
The H-section members are large, and large-scale cutting and readjustment on site would occupy the construction area and disrupt material management and site order within the resort.
Our Solution
According to the walkway spans, column spacing and repeated unit layout, we segmented the H-section columns and main beams so that the sections can be joined continuously along the direction of the walkway.
During production we checked the column center lines, main beam lengths and connection node positions to ensure good dimensional coordination between repeated canopy units.
For steel members directly exposed in the hotel public area, we tightened control over visible surfaces to reduce noticeable deformation, burrs and irregular cuts, leaving cleaner structural lines after installation.
The component design reserved space for pedestrian passage and drainage, so the main structure works well with the hotel entrance, walkways and landscaping.
Value Delivered to the Customer
The engineered H-section processing approach reduces repeated on-site alignment and component modification, and keeps the continuous walkway at a consistent span with clean structural lines.
The customer receives more than load-bearing steel members: a complete main-structure package that balances PV installation, pedestrian access, shading and architectural appearance.
Project Highlights