Project Background
The project in Mongolia has its PV arrays laid out on open ground. The local winter is cold with large seasonal temperature swings, and the site also faces strong wind, snow cover and a short construction window. These conditions place higher demands on manufacturing consistency of the support members, connection reliability and on-site assembly efficiency.
Based on the support scheme and component list provided by the customer, we completed the matched production of U-channel members and related connecting parts, providing manufacturing-side support for on-site assembly.

Figure 6. U-channel support package for the cold-climate Mongolian project
Project Challenges
Low temperatures and large seasonal temperature swings act repeatedly on the metal structure. If holes deviate, members deform or connection faces do not fit closely, uneven local stress and fastening difficulties are more likely to appear after on-site assembly.
The site is open, and members used at array edges and windward positions have different matching requirements from those in ordinary locations. Without clear separation between zones, parts may be installed in the wrong place or left out on site.
The time available for outdoor work in Mongolia is limited, and large amounts of cutting, drilling and welding are impractical on site. The customer therefore focused on whether the supports can be assembled directly according to the drawings after delivery.
Our Solution
First we carried out a manufacturing review of the customer drawings, checking U-channel length, hole spacing, connection direction and the assembly relationship between members, and identifying in advance details that could affect punching, connections or batch production.
During production we focused on controlling the profile section, straightness and consistency of consecutive holes. Hole openings and cut edges were treated to avoid burrs or local deformation that would interfere with bolt insertion and face contact in low temperatures.
Members required for array ends, windward zones and ordinary array positions were produced and identified separately according to their drawing purpose, so that reinforced parts match the correct installation zones.
Before batch production, typical connection nodes were trial-assembled to check the fit between U-channel members, bases and connecting parts, resolving hole conflicts and assembly issues before dispatch.
We also tightened inspection of the coating appearance and processed areas such as holes and cuts, reducing the risk of weak local protection under long-distance transport and cold outdoor conditions.
Value Delivered to the Customer
Through drawing review, key dimension control and trial assembly of typical nodes, the customer reduces on-site hole reaming, cutting and temporary modification, and makes better use of the limited construction window in Mongolia.
Members for different installation zones are matched accurately by purpose, lowering the risk of on-site assembly errors. The customer receives not just individual profiles, but a batch of support members that match the project drawings and assemble smoothly.